Post-Rehab Verification

Post-Rehabilitation Verification

A finished liner should be inspected like any other pipe: smooth transitions, no wrinkles blocking flow, no missed sections. Verification closes the project with evidence.

Symptoms we're called for

  • A completed relining job with no final footage
  • Flow or blockage issues after lining
  • Warranty claims that need condition evidence

Property types

  • Recently lined laterals and drains
  • Strata and commercial rehabilitation projects
  • Insurance and warranty files

Methods used

  • CCTV inspection of the finished liner
  • Transition and connection checks
  • Flow verification where suitable

Limitations, stated plainly

  • Verification reports condition at inspection time
  • Workmanship determinations remain with the contractor and warranty provider

What you receive

  • Post-work footage
  • A condition statement on the finished liner
  • A punch list of observations where relevant

Next steps

  • Resolve punch-list items with the installer
  • File footage with warranty documents
  • Re-inspect at warranty intervals